Efficiency Improvement Project

Ishikawa, 5 Why's, TOC, DOE

In production operations, total cost of binder was more than 4 Million Euro and the overall efficiency was 64%. 

A SMED Project: Overall Equipment Efficiency improved

SMED, Kanban. lean, Data collection

Production capacity is increased and cycle time is reduced using SMED (single minute exchange of dies) method. 

Overall efficiency improved from 62% to 74%.

DOE, SIPOC, Ishikawa, 5 Why's, Pareto

Efficiency was improved reducing variability and maintaining end product quality.

Capacity increased without investment

DOE, Regression

Production capacity is increased without investment. 

Gage R&R and Bias Experiement

Gage R&R, DOE

Experiment precision and repeatability was improved using DOE and GR&R. 

Six Sigma and Project Management Materials in Sale

Green Belt and Black Belt Training Materials, PMP training Materials

You can see and buy Gokhan's materials, for PMP and Green belt trainings. 

Determination thermal degredation of thermoset resins

Design for Six Sigma (DFSS), Pareto, Ishikawa Diagram

 

The ageing procedure was created to predict effective lifetime of plastic based products. 

 

Optimisation of ingredients

DOE, Mixture design, Regression, Anova, Surface Response Graphs

Active components (API) are optimized to minimize the cost, maintaining quality. 

Mixture Design of various resins

DOE, Mixture Design, Regression

 

The compatibility of different resins were investigated using Design of experiments 

 

Mixture Design for Biostability

DOE, Regression, ANOVA, Surface Response Methods

Production capacity is enhanced for bio-existence in sugar-based resin prevention using DOE mixture design tool. 

 

Knowledge Management tool created

Nonaka Takeuchi Method, WBS, Network and Activity Diagram

The knowledge management tool with searchable IP know-how was created using Nonaka Methodology. 

ARL calculation in EWMA charts, using Markov Chain Approach

Academic Project, EWMA (Exponential Average Moving Average), ARL (Average Run length), Markov Chain

Learn how ARL can be calculated based on Markov chains after Brook and Evans (1972). 

 

 

Shewhart, CUSUM, EWMA Comparison

Academic, EWMA, CUSUM, Quality Control, Shewhart

In Statistical Process Control (SPC), a variety of control charts have been applied including Shewhart, CUSUM and EWMA (e.g. Montgomery, 1991; Wetherill and Brown, 1991).  Each method has associated advantages and disadvantages that have been reported in the literature. 

Acceptance Sampling Procedure Optimization

Academic, OC curve, Acceptance Sampling

Learn the probability of accepting in reference to fraction defective, at the most feasible way. 

Please reload

Lean Six Sigma Projects 

Anchor 1

Inventory Reduction Project

Total inventory in retail operations is decreased without affecting stock-out. 

Workforce Optimization Project

Total workforce productivity is increased by data analytics and Multiskilling Optimization Model. 

​

Data Aligning across Systems

Return Product Cycle Time is reduced using future state maps and requirement engineering tools. 

Reducing Cycle Time: Store Opening

Store Opening Cycle Time is reduced using Value Stream Map. 

Reduction of Misplaced Invoices across Companies

Unnecessary invoice is reduced from 6 million TL to 0,3 million TL. 